In the CNA's coverage of the upcoming Circle Line tunnel works, Assoc Prof Raymond Ong (Civil and Environmental Engineering) emphasised that repairing deformed tunnel segments, which are caused by soil compression in soft marine clay, requires careful installation of steel lining under live track conditions. He highlighted the complexity and safety-critical nature of the work, noting the need for precise sequencing, inspection, and buffer time to ensure structural integrity before reopening.


