Publications

BOOKS

  1. Hwang, B.G., Ngo, J., and Zhu, H., “Managing Projects with Smart Technologies: Developing Technological Competency for Project Managers”, Taylor & Francis Group, 2024.
  2. Hwang, B.G., "Performance and Improvement of Green Construction Projects: Management Strategies and Innovations”, 1st Edition, Butterworth-Heinemann, Elsevier, 2018.
  3. Zhao, X., Hwang, B.G., and Low, S.P., “Enterprise Risk Management in International Construction Operations”, Springer, 2015.

BOOK CHAPTERS

  1. Zhao, X., Hwang, B.G., and Ming, S., “Green Construction Project Risk Management”, Body of Knowledge for Green Construction Project Management, World Scientific (accepted for publication).
  2. Ngo, J., Hwang, B.G., and Her, P., “Obstacles and Solutions for Adoption of Integrated Digital Delivery”, Building a Body of Knowledge in Construction Project Delivery, Procurement and Contracting, World Scientific, Aug 2022 (in press).
  3. Krishnankutty, P., Hwang, B.G., Shan, M. and Zhu, L., “Critical Review of Design for Maintainability Research in Buildings”, Innovative Production and Construction, World Scientific, May 2019.
  4. Hwang, B.G., Krishnankutty, P., Shan, M. and Wong, K.S.N., “Are Underground Residential Buildings Feasible? A Preliminary Investigation for Innovations”, Innovative Production and Construction, World Scientific, May 2019.

JOURNAL PAPERS

[Index, Quartile, 2022 Impact Factor, 2022 CiteScore]

  1. Zhu, H., Hwang, B. G., Tan, Y. Z., Wei, F.,(2024). “Building on Digital Twin: Overcoming Barriers and Unlocking Success in the Construction Industry”, accepted by ASCE Journal of Construction Engineering and Management. (SCIE, Q1, IF: 5.1, CS: 8.0)
  2. Wei, F., Hwang, B. G., Nur Syafiqah Binte Zainal, Zhu, H., (2024).“Trust, Team Effectiveness and Strategies: A Comparative Study between Virtual Teams and Traditional Face-to-face Teams”, ASCE Journal of Construction Engineering and Management. (SCIE, Q1, IF: 5.1, CS: 8.0)
  3. Wei, F., Hwang, B. G.*, Zhu, H., Ngo, J., (2023). “Project management for sustainable development: Critical determinants of technological competency for project managers with smart technologies”, Sustainable Development. (SSCI, Q1, IF: 12.5, CS: 15.2)
  4. Luo, M., Hwang, B. G., Zhao, X., Deng, X.* (2023). “Investigating the mechanism of international contractors' fraud from a moral perspective: evidence from Chinese international contractors”, Engineering, Construction and Architectural Management. (SCIE, Q2, IF: 4.1, CS: 7.0)
  5. Zhao, L., Wang, Q., Hwang, B. G., Chang-Richards, A., (in press), “Analysis of critical factors influencing sustainable infrastructure vulnerabilities using an ISM-MICMAC approach”, Engineering, Construction and Architectural Management. (SCIE, Q2, IF: 4.1, CS: 7.0)
  6. Zhan, H., Hwang, B. G.*, Zhu, H., & Ang, S. H. P. (2023), “Towards a sustainable built environment industry in Singapore: Drivers, barriers, and strategies in the adoption of smart facilities management”, Journal of Cleaner Production. (SCIE, Q1, IF: 11.1, CS: 18.5)
  7. Jia, J., Wu, M.*, Hwang, B.G. (2023), “Exploring factors influencing knowledge sharing in mobile social media groups within construction project teams”, Engineering, Construction and Architectural Management. (SCIE, Q2, IF: 4.1, CS: 7.0)
  8. Zhou Q.*, Deng X., Hwang, B.G., Mahmoudi A., Liu Y. (2023). “Integrating the Factors Affecting Knowledge Transfer within International Construction Projects: Individual and Team Perspectives”, ASCE Journal of Construction Engineering and Management. (SCIE, Q1, IF: 5.1, CS: 8.0)
  9. Liu Z, Hwang, B.G.*, Lim J. M. (2023). “Prefabricated and Prefinished Volumetric Construction: Assessing Implementation Status, Perceived Benefits, and Critical Risk Factors in the Singapore Built Environment Sector”, ASCE Journal of Management in Engineering. (SCIE, Q1, IF: 7.4, CS: 10.4)
  10. Xu Q., Hwang, B.G.*, Choo R. Q., Zheng X., Kong L., Wang Q., Liu X. (2023). “Comparison of Construction Project Risks Before and During COVID-19 in Singapore: Criticality and Management Strategies”, Construction Management and Economics. (ESCI, Q2, IF: 3.4, CS: 6.2)
  11. Liu, K., Hwang, B.G., Jia, J., Man, Q.*, Zhang, S. (2023). “Shaping online and offline informal learning networks in offsite construction projects: A proximity perspective”, Engineering, Construction and Architectural Management. (SCIE, Q2, IF: 4.1, CS: 7.0)
  12. Hu, W., Dong, J. *, Yang, K., Hwang, B.G., Ren, R., & Chen, Z. (2023). “Reliable design of urban surface-underground integrated logistics system network with stochastic demand and social-environmental concern”, Computers & Industrial Engineering. (SCIE, Q1, IF: 7.9, CS: 11.9)
  13. Jeong I., Hwang J., Kim J., Chi S. *, Hwang, B.G., Kim J. (2023). “Vision-based Productivity Monitoring of Tower Crane Operations during Curtainwall Installation Using a Database-free Approach”, ASCE Journal of Computing in Civil Engineering. (SCIE, Q1, IF: 6.9, CS: 12.1)
  14. Hu W., Dong J.*, Yang K, Hwang, B.G., Ren R., Chen Z. (2022). “Modeling Real-time operations of Metro-based urban underground logistics system network: A discrete event simulation approach”, Tunnelling and Underground Space Technology. (SCIE, Q1, IF: 6.9, CS: 11.5)
  15. Hu W., Dong J.*, Hwang, B. G., Ren R., & Chen Z. L. (2022). “Is Mass Rapid Transit Applicable for Deep Integration of Freight-Passenger Transport? A Multi-Perspective Analysis from Urban China”, Transportation Research Part A: Policy and Practice. (SSCI, Q1, IF: 6.4, CS: 12.4)
  16. Zhang N., Hwang, B. G.*, Deng X. P., & Tay F. (2022). “Exploring Critical Success Factors for Collaborative Contracting implementation in the Singapore Construction Industry”, Engineering, Construction and Architectural Management. (SCIE, Q2, IF: 4.1, CS: 7.0)
  17. Zhang N., Lu Y.*, Chen J., & Hwang, B. G. (2022). “An Agent-Based Diffusion Model for Residential Photovoltaic Deployment in Singapore: Perspective of Consumers’ Behaviour”, Journal of Cleaner Production. (SCIE, Q1, IF: 11.1, CS: 18.5)
  18. Zhang N., Hwang, B. G.*, Lu Y., & Ngo J. (2022). “A Behavior theory integrated ANN analytical approach for understanding households adoption decisions of residential photovoltaic (RPV) system”, Technology in Society. (SSCI, Q1, IF: 9.2, CS: 9.2)
  19. Zhao L., Wang Q.*, & Hwang, B. G. (2022). “How to Promote Urban Intelligent Transportation: A Fuzzy Cognitive Map Study”, Frontiers in Neuroscience. (SCIE, Q2, IF: 4.3, CS: 6.8)
  20. Ngo J., & Hwang, B. G.* (2022). “Critical Project Management Knowledge and Skills for Managing Projects with Smart Technologies”, ASCE Journal of Management in Engineering. (SCIE, Q1, IF: 7.4, CS: 10.4)
  21. Zhou, Q. W., Deng X. P.*, Hwang, B. G., Zhao, X. B., & Zhang, N. (2022). “Developing the Framework of Tacit Knowledge Externalization in International Construction Projects”, KSCE Journal of Civil Engineering. (SCIE, Q3, IF: 2.2, CS: 3.9)
  22. Won, D., Hwang, B.G.*, Chi, S., & Kor, J.L. (2022) “Adoption of Three-Dimensional Printing Technology in Public Housing of Singapore: Drivers, Challenges, and Strategies”, ASCE Journal of Management in Engineering (SCIE, Q1, IF: 7.4, CS: 10.4)
  23. Luo, M., Hwang, B.G.*, Deng, X., Zhang, N., & Chang, T. (2022). “Major Barriers and Best Solutions to the Adoption of Ethics and Compliance Program in Chinese International Construction Companies: A Sustainable Development Perspective”, Buildings. (SCIE, Q2, IF: 3.8, CS: 3.1)
  24. Zhou, Q., Deng, X.*, Hwang, B.G., & Yu, M. (2021). “System Dynamics Approach of Knowledge Transfer from Projects to the Project-Based Organization”, International Journal of Managing Projects in Business. (SSCI, Q4, IF: 2.7, CS: 5.2)
  25. Zhu, H., Hwang, B.G.*, Ngo, J., & Tan, J. (2021). “Applications of Smart Technologies in Construction Project Management”, ASCE Journal of Construction Engineering and Management. (SCIE, Q1, IF: 5.1, CS: 8.0)
  26. Zhu, L.*, Ye, Q., Yuan, J., Hwang, B.G., &Cheng, Y. (2021). “A Scientometric Analysis and Overview of Research on Infrastructure Externalities”, Buildings, (SCIE, Q2, IF: 3.8, CS: 3.1)
  27. Dong B.X., Shan M.*, Hwang B.G. (2021). “Simulation of Transportation Infrastructures Resilience: A Comprehensive Review”, Environmental Science and Pollution Research. (SCIE, Q1, IF: 5.8, CS: 7.9)
  28. Shan, M., Li, Y.S., Hwang, B.G.*, Chua, J.E. (2021). “Productivity Metrics and Its Implementations in Construction Projects: A Case Study of Singapore”, Sustainability. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  29. Hwang, B.G., Ngo, J.*, Teo, J.Z.K. (2021). “Challenges and Strategies for the Adoption of Smart Technologies in the Construction Industry: The Case of Singapore”, ASCE Journal of Management in Engineering. (SCIE, Q1, IF: 7.4, CS: 10.4)
  30. Xu, Q., Hwang, B.G.*, Lu, Y. J. (2021). “Households’ acceptance analysis of a marketized behavioural intervention - Household Energy-saving Option”, Journal of Cleaner Production. (SCIE, Q1, IF: 11.1, CS: 18.5)
  31. Zhang, N., Deng X.P.*, Hwang, B.G., Muchao, B., Amin, M. (2021). “A Novel Approach to Selecting the Best Partner for High-Speed Rail Firms”, Engineering Construction & Architectural Management. (SCI/SSCI, Q2, IF:4.1, CS: 7.0)
  32. Xu, Q., Hwang, B. G.*, & Lu, Y. (2021). “Exploring the Influencing Paths of Behaviour-driven Household Energy-saving Intervention - Household Energy Saving Option (HESO)”, Sustainable Cities and Society. (SCIE, Q1, IF: 11.7, CS: 18.4)
  33. Kuo, Y.*, Huh, Y., & Hwang, B. G. (2021). “A Comparative Analysis of Residents’ Satisfaction with Apartment Building Management and Maintenance Services in South Korea and Taiwan”, Quality & Quantity. (SCIE/SSCI, Q2, IF: 1.072, CS: 4.9)
  34. Hwang, B. G., Li, Y. S., Shan, M.*, & Chua, J. E. (2020). “Prioritizing Critical Management Strategies to Improving Construction Productivity: Empirical Research in Singapore”, Sustainability. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  35. Won, D., Hwang, B.G.* & Chng S.J. (2020). "Assessing the Effects of Workforce Diversity on Project Productivity Performance for Sustainable Workplace in the Construction Industry", Sustainable Development. (SSCI, Q1, IF: 12.5, CS: 15.2)
  36. Xu, Q., Lu Y. J.*, Hwang, B.G., Kua, H.W. (2020). “Reducing residential energy consumption through a marketized behavioral Intervention: the approach of Household Energy Saving Option (HESO)”, Energy and Buildings. (SCIE, Q1, IF: 6.7, CS: 11.8)
  37. Hu, W., Dong, J.*, Hwang, B.-G., Ren, R., & Chen, Z. (2020). “A preliminary prototyping approach for emerging metro-based underground logistics systems: Operation mechanism and facility layout”, International Journal of Production Research. (SCI, Q1, IF: 9.2, CS: 18.1)
  38. Hwang, B.G., Ngo, J.* & Her, P.W.Y. (2020). “Integrated Digital Delivery: Implementation status and project performance in the Singapore construction industry”, Journal of Cleaner Production, 262, 121396. (SCIE, Q1, IF: 11.1, CS: 18.5)
  39. Zhang, N., Hwang, B.G., Deng, X.P.*, & Ning, Y. (2020). “Achieving transient competitive advantage in high-speed rail projects bidding: sustainable development perspective”, Sustainable Development. (SSCI, Q1, IF: 12.5, CS: 15.2)
  40. Shan, M., Hwang, B.G.*, Caldas, C.H., Yin, Z., & Oliveira, D. (2020). “Towards cleaner and more productive maintenance in petrochemical facilities: Mechanization and an assessment method”, Journal of Cleaner Production, 259, 120864. (SCIE, Q1, IF: 11.1, CS: 18.5)
  41. Zhang, N., Hwang, B.G.*, Deng, X., & Tay, F.Y.X. (2020). “Collaborative Contracting in the Singapore Construction Industry: Current Status, Major Barriers and Best Solutions”, Engineering, Construction and Architectural Management. (SCIE, Q2, IF: 4.1, CS: 7.0)
  42. Ngo, J., Hwang, B.G.*, & Zhang, C. (2020). “Factor-based big data and predictive analytics capability assessment tool for the construction industry”, Automation in Construction. (SCIE, Q1, IF: 10.3, CS: 16.7)
  43. Zhao, X.J., Hwang, B.G.*, & Lim, J. (2020) “Job Satisfaction of Project Managers in Green Construction Projects: Constituents, Barriers, and Improvement Strategies”, Journal of Cleaner Production, 246, 118968. (SCIE, Q1, IF: 11.1, CS: 18.5)
  44. Zhang, N., Deng, X.*, Hwang, B.G., & Niu, Y. (2020). “How to balance interfirm relationships? A case from high-speed railway industry”, Journal of Business & Industrial Marketing. (SSCI, Q3, IF: 3.1, CS: 5.8)
  45. Zhou, Q., Deng, X.*, Hwang, B.G., & Ji, W. (2020). “Integrated Framework of Horizontal and Vertical Cross-Project Knowledge Transfer Mechanism within Project-Based Organizations”, ASCE Journal of Management in Engineering, 36(5), 4020062. (SCIE, Q1, IF: 7.4, CS: 10.4)
  46. Hu, W., Dong, J.*, Hwang, B.G., Ren, R., & Chen, Z. (2020). “Hybrid optimization procedures applying for two-echelon urban underground logistics network planning: A case study of Beijing”, Computers & Industrial Engineering, 144, 106452. (SCIE, Q1, IF: 7.9, CS: 11.9)
  47. Hu, W., Dong, J*., Hwang, B. G., Ren, R., Chen, Y., & Chen, Z. (2020). “Using system dynamics to analyse the development of urban freight transportation system based on rail transit: A case study of Beijing”, Sustainable Cities and Society, 53, 101923. (SCIE, Q1, IF: 11.7, CS: 18.4)
  48. Shan, M., Liu, W.Q., Hwang, B.G.*, and Lye, J.M. (2020). “Critical Success Factors for Small Contractors to Conduct Green Building Construction Projects in Singapore: Identification and Comparison with Large Contractors”,Environmental Science and Pollution Research, 27(8), 8310-8322. (SCIE, Q1, IF: 5.8, CS: 7.9)
  49. Wang, Y., Liu, J., Gao, R.*, & Hwang, B. G. (2020). “Government subsidies in Public-Private Partnership projects based on altruistic theory”, International Journal of Strategic Property Management, 24(3), 153-164. (SSCI, Q4, IF: 2.7, CS: 4.6)
  50. Hu, W., Dong, J.*, Hwang, B.G., Ren, R., & Chen, Z. (2020). “Network planning of urban underground logistics system with hub-and-spoke layout: Two phase cluster-based approach”, Engineering, Construction and Architectural Management, (SCIE, Q2, IF: 4.1, CS: 7.0)
  51. Wuni, I.Y.*, Shen, G.Q.P., Hwang, B.G. (2020). “Risks of module integrated construction: a review and future research directions”. Frontiers of Engineering Management, 7(1), 63-80. (ESCI, Q2, IF: 7.4)
  52. Hwang, B.G., Shan, M.*, Ong, J.J.M., and Krishnankutty, P. (2019). “Mechanization in Building Construction Projects: Assessment and Views from the Practitioners”, Production Planning and Control, 1-16. (SCIE, Q1, IF: 8.3, CS: 12.8)
  53. Hwang, B.G., Zhao, X.J.*, and Lim, J. (2019) “Job Satisfaction of Project Managers in Green Construction Projects: Influencing Factors and Improvement Strategies”, Engineering, Construction and Architectural Management, 27(1), 205-226. (SCIE, Q2, IF: 4.1, CS: 7.0)
  54. Krishnankutty, P., Hwang, B.G.*, Caldas. C.H., Muralidharan, S. and Oliveira,. D. (2019). “Assessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants”, Sustainability, 11(5), 1239. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  55. Chang, T., Deng, X.*, and Hwang, B.G. (2019) “Investigating Political Risk Paths in International High-Speed Railway Projects: The Case of Chinese International Contractors”, Sustainability, 11(15), 4157. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  56. Hu, W., Dong, J.*, Hwang, B.G., Ren, R. and Chen, Z. (2019). "A Scientometrics Review on City Logistics Literature: Research Trend, Advanced Theory and Practice", Sustainability, 11 (10), 2724. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  57. Alhamouri, K.*, Caldas, C.H., Hwang, B.G., Krishnankutty, P. and Oliveira, D. (2019). “Utilization of Workface Planning for the Execution of Maintenance Activities, Shutdowns, and Turnarounds in Petrochemical Facilities – A Case Study”, International Journal of Construction Management, 1-15. (ESCI, Q2, IF: 3.9, CS: 7.1)
  58. Dong, J., Xu, Y.*, Hwang, B.G., Ren, R. and Chen, Z. (2019). “The Impact of Underground Logistics System on Urban Sustainable Development: A System Dynamics Approach”, Sustainability, 11(5), 1223. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  59. Chang, T., Deng, X.*, Hwang, B.G., and Zhao, X. (2019). “Improving Quantitative Assessment of Political Risk in International Construction Projects: The Case of Chinese Construction Companies”, ASCE Journal of Construction Engineering and Management, 145(12), 4019083. (SCIE, Q1, IF: 5.1, CS: 8.0)
  60. Yin, Z. *, Caldas, C.H., Oliveria, D., Hwang, B.G., and Shan, M. (2019). “Mechanization Level Assessment and Technology Identification for Productivity Improvement in Petrochemical Facility Maintenance”, Journal of Quality in Maintenance Engineering. (ESCI, Q4, IF: 1.5, CS: 3.6)
  61. Hwang, B.G., Shan, M.*, and Lye, J.M. (2018). “Adoption of Sustainable Construction for Small Contractors: Major Barriers and Best Solutions”, Clean Technologies and Environmental Policy, 20 (10), 2223-2237. (SCIE, Q2, IF: 4.3, CS: 7.6)
  62. Hwang, B.G., Zhao, X.*, and Kay, W.Y. (2018). “Effect of BIM on Rework in Construction Projects in Singapore: Status Quo, Magnitude, Impact and Strategies”, ASCE Journal of Construction Engineering and Management, 145(2), 04018125. (SCIE, Q1, IF: 5.1, CS: 8.0)
  63. Hwang, B.G., Shan, M.*, and Looi, K.Y. (2018). “Knowledge-based Decision Support System for Prefabricated Prefinished Volumetric Construction”, Automation in Construction, 94(October), 168-178. (SCIE, Q1, IF: 10.3, CS: 16.7)
  64. Hwang, B.G., Krishnankutty, P.*, Zhu, L., Caldas C.H., Shounak, A. and Mulva, S. (2018). “Improving Labour Productivity in Process Construction Maintenance and Shutdown /Turnaround Projects”, International Journal of Construction Management, 1-15. (ESCI, Q2, IF: 3.9, CS: 7.1)
  65. Hwang, B.G., Shan, M.*, Zhu L., and Lim, W.C. (2018). “Cost Control in Megaprojects: Efficacy, Tools and Techniques, Key Knowledge Areas, and Project Comparisons”, International Journal of Construction Management, 1-13. (ESCI, Q2, IF: 3.9, CS: 7.1)
  66. Hwang, B.G., and Shan, M.* (2018). “Management Strategies and Innovations: Important Roles to Sustainable Construction”, Sustainability, 10(3), 606. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  67. Hwang, B.G., Shan, M.*, and Looi, K.Y. (2018). “Key Constraints and Mitigation Strategies for Prefabricated Prefinished Volumetric Construction”, Journal of Cleaner Production, 183, 183-193. (SCIE, Q1, IF: 11.1, CS: 18.5)
  68. Hwang, B.G., Shan, M.*, and Phuah, S.L. (2018). “Safety in Green Building Construction Projects in Singapore: Performance, Critical Issues, and Improvement Solutions”, KSCE Journal of Civil Engineering, 22(2), 447-458. (SCIE, Q3, IF: 2.2, CS: 3.9)
  69. Zhao, X., Hwang, B.G.*, and Lu, Q. (2018). "Typology of Business Model Innovations for Delivering Zero Carbon Buildings", Journal of Cleaner Production, 196(September), 1213- 1226. (SCIE, Q1, IF: 11.1, CS: 18.5)
  70. Chang T., Hwang, B.G., Deng, X.*, and Zhao, X. (2018). “Identifying Political Risk Management Strategies in International Construction Projects”, Advances in Civil Engineering, 2018, 1016384. (SCIE, Q3, IF: 1.8, CS: 3.4)
  71. Shan, M. and Hwang, B.G.*(2018). “Green Building Rating Systems: Global Reviews of Practices and Research Efforts”, Sustainable Cities and Society, 39(May), 172-180. (SCIE, Q1, IF: 11.7, CS: 18.4)
  72. Chang T., Deng, X.*, Hwang, B.G. and Zhao, X. (2018). “Political Risk Paths in International Construction Projects: Case Study from Chinese Construction Enterprises”, Advances in Civil Engineering, 2018, 6939828. (SCIE, Q3, IF: 1.8, CS: 3.4)
  73. Zhao, X., Chang, T.*, Hwang, B. G., and Deng, X. (2018). “Critical factors influencing business model innovation for sustainable buildings”, Sustainability, 10(1), 33. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  74. Moon, S., Shin, Y., Hwang, B.G., and Chi, S.* (2018). “Document Management System Using Text Mining for International Acquisition of International Construction”, KSCE Journal of Civil Engineering, 22(12), 4791-4798. (SCIE, Q3, IF: 2.2, CS: 3.9)
  75. Zhu, L., Shan, M. and Hwang, B.G.* (2018). “Overview of Design for Maintainability in Building and Construction Research”, Journal of Performance of Constructed Facilities, 32(1), 04017116. (SCIE, Q3, IF: 2.5, CS: 4.8)
  76. Jung, M., You, S., Chi, S.*, Yu, I., and Hwang B.G. (2018). “The Relationship between Unbilled Accounts Receivable and Financial Performance in the Accounting of Construction Contractors”, Sustainability, 10(8), 2679. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  77. Hwang, B.G., Shan, M.*, Phua, H., and Chi, S. (2017). “An Exploratory Analysis of Risks in Green Residential Building Construction Projects: The Case of Singapore”, Sustainability, 9(7), 1116. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  78. Hwang, B.G., Zhu, L.*, and Tan, S.H. (2017). “Green Business Park Project Management: Barriers and Solutions for Sustainable Development”, Journal of Cleaner Production, 115(March), 203–213. (SCIE, Q1, IF: 11.1, CS: 18.5)
  79. Hwang, B.G., Zhu, L.*, Wang, Y., and Cheong, X., (2017). “Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance”, Project Management Journal, 48(4), 67-79. (SSCI, Q2, IF: 5.0, CS: 8.8)
  80. Hwang, B.G., Shan, M.*, and Supa'at, N.N.B. (2017). “Green Commercial Building Projects in Singapore: Critical Risk Factors and Mitigation Measures”, Sustainable Cities and Society, 30, 237-247. (SCIE, Q1, IF: 11.7, CS: 18.4)
  81. Hwang, B.G., Zhu, L.*, and Tan, S.H. (2017). “Identifying Critical Success Factors for Green Business Parks: Case Study of Singapore”, ASCE Journal of Management in Engineering, 33(5), 04017023 (SCIE, Q1, IF: 7.4, CS: 10.4)
  82. Hwang, B.G., Zhu, L.*, and Tan, T.M. (2017). “Productivity Improvement Strategies for Green Construction Projects: Performance Comparison and Critical Factors”, International Journal of Sustainable Building Technology & Urban Development, 8(1), 45-53. (Scopus, Q4, CS: 0.7)
  83. Hwang, B.G., Shan, M.*, Xie, S., and Chi, S. (2017). “Investigating Residents’ Perceptions of Green Retrofit Program in Mature Residential Estates”, Habitat International, 63(May), 103-112. (SSCI, Q1, IF: 6.8, CS: 9.5). (Highly Cited Paper recognised by Essential Science Indicators, Clarivate Analytics)
  84. Hwang, B.G., Zhao, X.*, and Chin, W.Y. (2017). “International Construction Joint Ventures with Developing Countries: Risk Assessment and Allocation Preferences”, Engineering, Construction and Architectural Management, 24(2), 209-228. (SCIE, Q2, IF: 4.1, CS: 7.0)
  85. Hwang, B.G., Zhu, L.*, and Tan, T.M. (2017). “Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore”, ASCE Journal of Management in Engineering, 33(3), 04016052. (SCIE, Q1, IF: 7.4, CS: 10.4)
  86. Shan, M., Hwang, B.G.*, and Wong, S.N.K. (2017). “A Preliminary Investigation of Underground Residential Buildings: Advantages, Disadvantages, and Critical Risks”, Tunnelling and Underground Space Technology, 70(November), 19-29. (SCIE, Q1, IF: 6.9, CS: 11.5)
  87. Shan, M., Hwang, B.G.*, and Zhu, L. (2017). “A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts”, Sustainability, 9(12), 2347. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  88. Chun, H., Chi, S.*, and Hwang, B.G. (2017). “A Spatial Disaster Assessment Model of Social Resilience Based on Geographically Weighted Regression”, Sustainability, 9(12), 2222. (SCIE/SSCI, Q2, IF: 3.9, CS: 5.8)
  89. Hwang, B.G., Shan, M.*, and Tan, K. (2016). “Investigating Reworks in Green Building Construction Projects: Magnitude, Influential Factors, and Solutions”, International Journal of Environmental Research, 10(4), 499-510. (SCIE, Q3, IF: 3.2, CS: 4.7)
  90. Zhao, X.*, Hwang, B.G., and Gao, Y. (2016). “A Fuzzy Synthetic Evaluation Approach for Risk Assessment: A Case of Singapore's Green Projects”, Journal of Cleaner Production, 115(March), 203–213. (SCIE, Q1, IF: 11.1, CS: 18.5)
  91. Zhao, X.*, Hwang, B.G. and Lee, H.N. (2016). “Identifying Critical Leadership Styles of Project Managers for Green Building Projects”, International Journal of Construction Management, 16(2), 150-160. (ESCI, Q2, IF: 3.9, CS: 7.1)
  92. Zhao, X.*, Hwang, B.G., and Low, S.P. (2016). “An Enterprise Risk Management Knowledge-Based Decision Support System for Construction Firm”, Engineering, Construction and Architectural Management, 23(3), 369-384. (SCIE, Q2, IF: 4.1, CS: 7.0)
  93. Hwang, B.G., Zhao, X.*, See, Y., and Chong, Y. (2015). “Addressing Risks in Green Retrofit Projects: The Case of Singapore”, Project Management Journal, 46(4), 76-89. (SSCI, Q2, IF: 5.0, CS: 8.8)
  94. Hwang, B.G., Zhao, X.*, and Yu, S. (2015). “Risk Identification and Allocation in Underground Rail Construction Joint Ventures: Contractors’ Perspective”, Journal of Civil Engineering and Management, 22(6), 758-767. (SCIE, Q1, IF: 4.3, CS: 5.9)
  95. Hwang, B.G., Zhao, X.*, and Ong, S.Y. (2015). “Value Management in Singaporean Building Projects: Implementation Status, Critical Success Factors and Risk Factors”, ASCE Journal of Management in Engineering, 31(6), 04014094. (SCIE, Q1, IF: 7.4, CS: 10.4)
  96. Hwang, B.G.*, and Chen, M. (2015). “Sustainable Risk Management in the Construction Industry: Lessons Learned from the IT industry”, Technological and Economic Development of Economy, 21(2), 215-230. (SSCI, Q1, IF: 5.9, CS: 9.1)
  97. Hwang, B.G.*, and NG, H.B. (2015). “Project Network Management: Risks and Contributors from the Viewpoint of Contractors and Sub-Contractors”, Technological and Economic Development of Economy, 22(4), 631-648. (SSCI, Q1, IF: 5.9, CS: 9.1)
  98. Hwang, B.G., Zhao, X.*, and Tan, L.G. (2015). “Green Building Projects: Schedule Performance, Influential Factors and Solutions”, Engineering, Construction and Architectural Management, 22(3), 327-346. (SCIE, Q2, IF: 4.1, CS: 7.0)
  99. Hwang, B.G. and Zhao, X.* (2015). “Review of Global Performance Measurement and Benchmarking Initiatives”, International Journal of Construction Management, 15(4), 265-275. (ESCI, Q2, IF: 3.9, CS: 7.1)
  100. Zhao, X.*, Hwang, B.G., Low, S.P., and Wu, P. (2015). “Reducing Hindrances to Enterprise Risk Management Implementation in Construction Firms”, ASCE Journal of Construction Engineering and Management, 141(3), 04014083. (SCIE, Q1, IF: 5.1, CS: 8.0)
  101. Zhao, X.*, Hwang, B.G., and Low, S.P. (2015). “Enterprise Risk Management in International Construction Firms: Drivers and Hindrances”, Engineering, Construction and Architectural Management, 22(3), 347 -366. (SCIE, Q2, IF: 4.1, CS: 7.0)
  102. Hwang, B.G., Zhao, X.*, and Do, T.H.V. (2014). “Influence of Trade-Level Coordination Problems on Project Productivity”, Project Management Journal, 45(5), 5-14. (SSCI, Q2, IF: 5.0, CS: 8.8)
  103. Hwang, B.G., Zhao, X.*, and Goh, K.J. (2014). “Investigating the Client-Related Rework in Building Projects: The Case of Singapore”, International Journal of Project Management, 32(4), 698-708. (SSCI, Q1, IF: 0, CS: 12.7)
  104. Hwang, B.G.*, and Yang, S.M. (2014). “Rework and Schedule Performance: A Profile of Incidence, Impact, Causes and Solutions”, Engineering, Construction and Architectural Management, 21(2), 190-205. (SCIE, Q2, IF: 4.1, CS: 7.0)
  105. Hwang, B.G., Zhao, X.*, and Toh, L.P. (2014). “Risk Management in Small Construction Projects in Singapore: Status, Barriers and Impact”, International Journal of Project Management, 32(1), 116-124 (SSCI, Q1, IF: 0, CS: 12.7; Top 25 Hottest Articles in the area of Decision Sciences by Science Direct)
  106. Zhao, X.*, Hwang, B.G., and Low, S.P. (2014). “Enterprise Risk Management Implementation in Construction Firms: An Organizational Change Perspective”, Management Decision, 52(5), 814-833. (SSCI, Q2, IF: 4.6, CS: 10.3)
  107. Zhao, X.*, Hwang, B.G., and Low, S.P. (2014). “Investigating Enterprise Risk Management Maturity in Construction Firms”, ASCE Journal of Construction Engineering and Management, 140(8), 050140006. (SCIE, Q1, IF: 5.1, CS: 8.0)
  108. Zhao, X.*, Hwang, B.G., and Low, S.P. (2014). “Critical Success Factors for Enterprise Risk Management in Chinese Construction Companies”, Construction Management and Economics, 31(1), 1199-1214. (ESCI, Q2, IF: 3.4, CS: 6.2)
  109. Zhao, X., Hwang, B.G.*, and Phng, W. (2014). “Construction Project Risk Management in Singapore: Resources, Effectiveness, Impact, and Understanding”, KSCE Journal of Civil Engineering, 18(1), 27-36. (SCIE, Q3, IF: 2.2, CS: 3.9)
  110. Singhaputtangkul, N.*, Low, S.P., Teo, A.L., and Hwang, B.G. (2014). “Criteria for architects and engineers to achieve sustainability and buildability in building envelope designs”, ASCE Journal of Management in Engineering, 30(2), 236-245. (SCIE, Q1, IF: 7.4, CS: 10.4)
  111. Singhaputtangkul, N.*, Low, S.P., Teo, A.L., and Hwang, B.G. (2014). “Analysis of criteria for decision making to achieve sustainability and buildability in building envelope design”, Architectural Science Review, 57(1), 20-30. (Scopus, Q1, CS: 3.1)
  112. Hwang, B.G.*, and Soh, C.K. (2013). “Trade Level Productivity Measurement: Critical Challenges and Solutions”, ASCE Journal of Construction Engineering and Management, 139(11), 04013013. (SCIE, Q1, IF: 5.1, CS: 8.0)
  113. Hwang, B.G.*, and Leong, L.P. (2013). “Comparison of Schedule Delay and Causal Factors between Traditional and Green Construction Projects”, Technological and Economic Development of Economy, 19(2), 277–297. (SSCI, Q1, IF: 5.9, CS: 9.1)
  114. Hwang, B.G.*, and Ng, W.J. (2013). “Project Management Knowledge and Skills for Green Construction: Overcoming Challenges”, International Journal of Project Management, 31(2), 272-284. (SSCI, Q1, IF: 0, CS: 12.7; Top 25 Hottest Articles in the area of Decision Sciences by Science Direct)
  115. Hwang, B.G.* and Lim, E.S. (2013). “Critical Success Factors for Key Players and Objectives: Case Study of Singapore”, ASCE Journal of Construction Engineering and Management, 139(2), 204 - 215. (SCIE, Q1, IF: 5.1, CS: 8.0)
  116. Hwang, B.G., Zhao, X*. and Gay, J.S. (2013). “Public-Private Partnership Projects in Singapore: Factors, Critical Risks and Preferred Risk Allocation from the Perspective of Contractors”, International Journal of Project Management, 31(3), 424 – 433. (SSCI, Q1, IF: 0, CS: 12.7; Most Cited Articles in International Journal of Project Management)
  117. Hwang, B.G., Leong, L.P., and Huh, Y.K.* (2013). “Sustainable Green Construction Management: Schedule Performance and Improvement”, Technological and Economic Development of Economy, 19(Sup1), 43-57. (SSCI, Q1, IF: 5.9, CS: 9.1)
  118. Hwang, B.G.*, Tan, H., and Sathish, S. (2013). “Capital Project Performance Measurement and Benchmarking in Singapore”, Engineering, Construction and Architectural Management. 20(2), 143-159. (SCIE, Q2, IF: 4.1, CS: 7.0)
  119. Hwang, B.G., Zhao, X.*, and Ng, S.Y. (2013). “Identifying the Critical Factors Affecting Schedule Performance of Public Housing Projects”, Habitat International, 38, 214-221. (SSCI, Q1, IF: 6.8, CS: 9.5)
  120. Hwang, B.G., and Ong, Y.* (2013). "The Impact of Oil Price Fluctuation on the Singapore Construction Industry". International Journal of Project Organisation and Management, 5(3), 265-277. (Scopus, Q3, CS: 0.9)
  121. Zhao, X., Hwang, B.G.*, and Yu, S. (2013). “Identifying the Critical Risks in Underground Rail International Construction Joint Ventures: Case Study of Singapore”, International Journal of Project Management, 31(4), 554-566. (SSCI, Q1, IF: 0, CS: 12.7)
  122. Zhao, X.*, Hwang, B.G., and Low, S.P. (2013). “Developing a Fuzzy Enterprise Risk Management Maturity Model for Construction Firms”, ASCE Journal of Construction Engineering and Management, 139(9), 1179-1189. (SCIE, Q1, IF: 5.1, CS: 8.0)
  123. Singhaputtangkul, N.*, Low, S.P., Teo, A.L., and Hwang, B.G. (2013). “Knowledge-based Decision Support System Quality Function Deployment (KBDSS-QFD) Tool for Assessment of Building Envelopes”, Automation in Construction, 35, 314-328. (SCIE, Q1, IF: 10.3, CS: 16.7)
  124. Hwang, B.G.*, and Low, L.K. (2012). “Construction Project Change Management in Singapore: Status, Importance and Impact”, International Journal of Project Management, 30(7), 817-826. (SSCI, Q1, IF: 0, CS: 12.7)
  125. Hwang, B.G.*, and Ho, J. (2012). “Front-End Planning in the Singapore Construction Industry: Status, Importance and Impact”, ASCE Journal of Construction Engineering and Management, 138(4), 469-584. (SCIE, Q1, IF: 5.1, CS: 8.0)
  126. Hwang, B.G.*, and Tan, J.S. (2012). “Green Building Project Management: Obstacles and Solutions for Sustainable Development”, Sustainable Development, 20(5), 335-349 (SSCI, Q1, IF: 12.5, CS: 15.2)
  127. Hwang, B.G.*, Thomas, S.R., and Caldas, C.H. (2012). “Application of Customized Industry-Specific Metrics to Assessment of Capital Projects Performances”, KSCE Journal of Civil Engineering, 16(1), 19-27. (SCIE, Q3, IF: 2.2, CS: 3.9)
  128. Huh, Y., Hwang, B.G.*, and Lee, J.S. (2012). "Feasibility Analysis Model for Developer- Proposed Housing Projects in the Republic of Korea". Journal of Civil Engineering and Management, 18(3), 345-355. (SCIE, Q1, IF: 4.3, CS: 5.9)
  129. Suk, S.J.*, Hwang, B.G., Dai, J., Caldas, C.H., and Mulva, S.P. (2012). “Performance Dashboard for a Pharmaceutical Project Benchmarking Program”, ASCE Journal of Construction Engineering and Management, 137(7), 864-876. (SCIE, Q1, IF: 5.1, CS: 8.0)
  130. Hwang, B.G.*, Liao, P.C., and Leonard, M.P. (2011). “Performance and Practice Use Comparisons: Public vs. Private Owner Projects”, KSCE Journal of Civil Engineering, 15(6), 957-963. (SCIE, Q3, IF: 2.2, CS: 3.9)
  131. Hwang, B.G.*, and Chu, P.M. (2011). “Risk Management Software Utilization in the Singapore Construction Industry: Evaluation and Improvement”, KICEM Journal of Construction Engineering and Project Management, 1(2), 28-36.
  132. Hwang, B.G.*, and Yeo, C.B. (2011). “Perception on Benefits of Construction Waste Management in the Singapore Construction industry”, Engineering, Construction and Architectural Management, 18(4), 394-406. (SCIE, Q2, IF: 4.1, CS: 7.0)
  133. Hwang, B.G.*, Thomas, S.R., and Caldas, C.H. (2010). “Performance Metric Development for Pharmaceutical Construction Projects”, International Journal of Project Management, 28(3), 265-274. (SSCI, Q1, IF: 0, CS: 12.7)
  134. Hwang, B.G.*, Thomas, S.R., Haas, C.T., and Caldas, C.H. (2009). “Measuring the Impacts of Rework on Construction Cost Performance”, ASCE Journal of Construction Engineering and Management, 135(3), 187-198. (SCIE, Q1, IF: 5.1, CS: 8.0; Top 20 Most Cited ASCE Journal of Construction Engineering and Management Articles)
  135. Hwang, B.G.*, Thomas, S.R., Degezelle, D.L., and Caldas, C.H. (2008). “Development of a Benchmarking Framework for Pharmaceutical Capital Projects”, Construction Management and Economics, 26(2), 177-195. (ESCI, Q2, IF: 3.4, CS: 6.2)
  136. Hwang, B.G., and Huh, Y. (2008). "Identifying the Relationship between Total Quality Management and Sustainable Competitive Advantage from the Construction Industry Perspective", Korean Journal of Construction Engineering and Management, 9(2), 199-207.
  137. Lee, Y.S. and Hwang, B.G. (2007). “Impacts of Contract types on Construction Project Performance-Cost Reimbursable and Lump Sum”, Korean Journal of Construction Engineering and Management, 8(2), 155-163.
  138. Hwang, B.G.* (2007). “An Analysis of the Influence of Rework on Construction Cost Performance – Focused on Data from Owner Reported Projects”, Journal of the Architectural Institute of Korea, 23(2), 139-147.
  139. Hwang, B.G.* (2006). "Quantitative Analysis of Magnitude of Rework by Project Type and Sources of Rework", Korean Journal of Construction Engineering and Management, 7(6), 202-211.

CONFERENCE PAPERS

  1. Zhu, H.J., Hwang, B.G.* (2023), " Development of a Sensor-Based Safety Performance Analytic Mobile System to Detect, Alert and Analyze Workers’ Unsafe Behaviors", ASCE International Conference on Computing in Civil Engineering 2023 (i3CE 2023), 25-28 June 2023, Oregon, Corvallis, USA
  2. Ngo, J.*, Hwang, B.G., Teo, J.Z.K. (2021), "Assessing the Impact of Smart Technologies on Project Management", ASCE International Conference on Computing in Civil Engineering 2021 (i3CE 2021), 12 - 14 September 2021, Orlando, Florida, USA
  3. Ngo, J., Hwang, B.G.*, Teo, J.Z.K. (2021), "Impact of Smart Technologies on Construction Projects: Improvements in Project Performance", Joint Conference CIB W78 - LDAC 2021, 11 - 15 October 2021, Luxemburg
  4. Liu, W.Q.*, Shan, M., Hwang, B.G., and Lye, J. (2020). Investigating the Critical Success Factors for Small Contractors to Implement Sustainable Construction. International Conference on Construction and Real Estate Management: Intelligent Construction and Sustainable Buildings 2020, 24-25 August, Stockholm, Sweden.
  5. Li, Y.S.*, Shan, M., Hwang, B.G., and Chua, J.E. (2020). Project Management Strategies to Improve Productivity: Case of Singapore. International Conference on Construction and Real Estate Management: Intelligent Construction and Sustainable Buildings 2020, 24-25 August, Stockholm, Sweden.
  6. Liu, W.Q.*, Shan, M., Hwang, B.G., and Lye, J. (2020). Investigating the Critical Success Factors for Small Contractors to Implement Sustainable Construction. International Conference on Construction and Real Estate Management: Intelligent Construction and Sustainable Buildings 2020, 24-25 August, Stockholm, Sweden.
  7. Li, Y.S.*, Shan, M., Hwang, B.G., and Chua, J.E. (2020). Project Management Strategies to Improve Productivity: Case of Singapore. International Conference on Construction and Real Estate Management: Intelligent Construction and Sustainable Buildings 2020, 24-25 August, Stockholm, Sweden.
  8. Won, D., Hwang, B.G., and Chi, S.* (2020), “IoT Based Earthwork Accident Case Analysis”, 37th International Symposium on Automation and Robotics in Construction (ISARC 2020), 26 – 30 October, Kokura, Japan.
  9. Ngo, J.*, Hwang, B.G, Zhang, C. (2020), “Big Data and Predictive Analytics in the Construction Industry: Definition, Applications, and Status Quo in Singapore’s Construction Industry”, Proceedings of 2020 Construction Research Congress (CRC 2020), 8 – 10 March, Arizona, United States.
  10. Ngo, J.*, Hwang, B.G, Her, P.W.Y. (2020), “Integrated Digital Delivery: Implementation Status, Project Performance, Barriers and Strategies”, Proceedings of 2020 Construction Research Congress (CRC 2020), 8 – 10 March, Arizona, United States.
  11. Hu, W., Dong, J.*, Hwang, B.G., Ren, R., & Chen, Z. (2020). Agent-based Simulation of Urban Freight Transport based on Metro Network: A Case Study of Nanjing. Proceedings of 2020 Construction Research Congress (CRC 2020), 8 – 10 March, Arizona, United States.
  12. Hu, W., Dong, J.*, Hwang, B.G., Ren, R., & Chen, Z. (2020). Prototype Design of Metro-based Urban Underground Logistics System: BIM Visualization. Proceedings of 2020 Construction Research Congress (CRC 2020), 8 – 10 March, Arizona, United States.
  13. Ngo, J.*, Hwang, B.G. (2019). “Construction Project Management in the Fourth Industrial Revolution: Key Technology Areas and Applications”, Proceedings of Chinese Research Institute of Construction Management (CRIOCM 2019), 29 November – 2 December, Chongqing, China.
  14. Ngo, J.*, Hwang, B.G., Chiam, L.Y.Z. (2019). “Big Data Adoption in the Singapore Construction Industry: Drivers, Challenges and Strategies”, Proceedings of Chinese Research Institute of Construction Management (CRIOCM 2019), 29 November – 2 December, Chongqing, China.
  15. Xu, Q.*, Lu, Y., and Hwang, B.G. (2019). “Effectiveness of Innovative Intervention – Household Energy Saving Option (HESO) on Promoting Energy Conservation in Residential Buildings”, Proceedings of Chinese Research Institute of Construction Management (CRIOCM 2019), 29 November – 2 December, Chongqing, China.
  16. Kim, J., Won, D., Chi, S., and Hwang, B.G. (2019). "Benchmarking Overseas Design for Safety Regulations and Practices for Better Safety Management". Korea Institute of Construction Engineering and Management (KICEM) Conference, Ilsan, Korea, November 2019.
  17. Xu, Q.*, Lu, Y., and Hwang, B.G. (2019). “An innovative way of promote residents energy efficient behaviors: Proposition of Household Energy Saving Option (HESO)”, Proceedings of the International Conference on Cleaner Production and Sustainability (CPS 2019), 30 October – 2 November 2019, Hongkong, China.
  18. Hu, W., Dong, J.*, Hwang, B.G., Chen, Z. (2019). “Combinatorial Optimization Techniques for Hub-and-Spoke Urban Underground Logistics System Planning”, Proceedings of The 7th International Conference on Transportation and Space-time Economics (TSTE 2019), 11 – 13 October, Beijing, China.
  19. Hwang, B.G., Liu, W.Q., Shan, M., and Lye, J.M. (2019). “Adoption of Sustainable Construction for Small Contractors: Major Barriers and Best Solutions”, Proceedings of Central Europe towards Sustainable Building, 2-4 July, Prague, Czech.
  20. Hu, W., Dong, J.*, Hwang, B.G., Na, X., Ren, R., and Chen, Z. (2019). “Simulation on the External Benefits and Development of Metro-based Underground Logistics System: A System Dynamics Approach”, Proceedings of 2019 International Conference on Resource Sustainability – Cities (icRS Cities 2019), 1-3 July, Adelaide, Australia.
  21. Hu, W., Dong, J.*, Hwang, B.G., Na, X., Ren, R., and Chen, Z. (2019). “Environmental Impacts of Urban Underground Logistics System on City Sustainable Development: An Integrated Approach using System Dynamics and Agent-Based Modelling”, Proceedings of 2019 International Conference on Resource Sustainability – Cities (icRS Cities 2019), 1-3 July, Adelaide, Australia.
  22. Zhang, N., Hwang, B.G., Deng, X.* (2019). “Smart Strategies for International HSR Rolling Stock Suppliers Improving Competitive Advantage”, Proceedings of CIB World Building Congress 2019, 17 – 21 June, Hong Kong, China.
  23. Zhang, N., Deng, X.*, Hwang, B.G., Bi, M. (2019). “Smart Strategy Choice for HSR Suppliers Entering International Market: A Case Study of CRH in Thailand Market”, Proceedings of CIB World Building Congress 2019, 17 – 21 June, Hong Kong, China.
  24. Liu, W.Q., Hwang, B.G., Shan, M., and Looi, K.Y. (2019). “Key Constraints and Mitigation Strategies for Prefabricated Prefinished Volumetric Construction”, Proceedings of 4th International Conference on Research Methodology for Built Environment and Engineering 2019, 24-25 April, Bangkok, Thailand.
  25. Li, Y.S., Hwang, B.G., Shan, M., and Looi, K.Y. (2019). “Developing a Knowledge-based Decision Support System for Prefabricated Prefinished Volumetric Construction”, Proceedings of 4th International Conference on Research Methodology for Built Environment and Engineering 2019, 24-25 April, Bangkok, Thailand.
  26. Hu, W., Dong, J.*, Guo, D., Ren, R., Chen, Z. and Hwang, B.G. (2018). “A multi-level Network Planning Method to Metro-based Underground Logistics System”, Proceedings of the 8th International Society on Underground Freight Transportation 2018, Beijing, China, November 2018.
  27. Chang, K., Lim, S., Chi, S*. and Hwang, B.G. (2018). “Sequential Pattern Analyses of Damages on Bridge Elements for Preventive Maintenance”, Proceedings of the 35th CIB W78 2018 Conference: IT in Design, Construction and Management, Chicago, Illinois, USA, October 2018
  28. Muralidharan S., Krishnankutty P., Hwang, B.G, Caldas C.H., Mulva S. (2018). “Enhancing Labour productivity in Petrochemical Construction and Maintenance Projects”, Proceedings of the 26th International Group for Lean Construction Conference (IGLC 2018), Chennai, India, July 2018.
  29. Hwang, B.G., Shan, M.*, and Xie, S. (2018). “Assessment on Green Retrofit Programs for Existing Mature Residential Estates in Singapore”, Proceedings of The 7th World Construction Symposium 2018: Built Asset Sustainability: Rethinking Design, Construction and Operations, Colombo, Sri Lanka, June
  30. Hwang, B.G., Shan, M., and Phua, H. (2018). “Assessing Risks in Green Residential Building Construction Projects: The Case of Singapore”, Proceedings of The 7th World Construction Symposium 2018: Built Asset Sustainability: Rethinking Design, Construction and Operations, Colombo, Sri Lanka, June
  31. Shan, M., Hwang, B.G., Zhu, L., and Cheong, X. (2018). “Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance”, Proceedings of The 7th World Construction Symposium 2018: Built Asset Sustainability: Rethinking Design, Construction and Operations, Colombo, Sri Lanka, June
  32. Moon S., Kim T., Hwang B.G., and Chi S. (2018). “Analysis of Construction Accidents Based on Semantic Search and Natural Language Processing”, Proceedings of the 35th International Symposium on Automation and Robotics in Construction (ISARC 2018) and the International AEC/FM Hackathon, Berlin, Germany, June
  33. Hwang, B.G., Krishnankutty, P., Shan, M., and Wong, K.S.N. (2017). “Are Underground Residential Buildings Feasible? A Preliminary Investigation for Innovations”, Proceedings of 2017 International Conference on Innovative Production and Construction, Perth, Australia, November 2017.
  34. Krishnankutty, P., Hwang, B.G., Zhu, L., and Shan, M. (2017). “A Preliminary Review of Design for Maintainability Research in Buildings”, Proceedings of 2017 International Conference on Innovative Production and Construction, Perth, Australia, November
  35. Chung, S., Lim, S., Chi, S., and Hwang, B.G. (2017). “Developing a Framework for Identifying Bridge Damage Patterns Based on Text Mining”, Proceedings of 2017 International Conference on Maintenance and Rehabilitation of Constructed Infrastructure Facilities (2017 MAIREINFRA), Seoul, Korea, July
  36. Hwang, B.G., Shan, M., Phuah, S.L., Chi, S., and Zhu, L. (2017). “Investigating Critical Safety Performance Factors in Green Building Construction Projects: The Case of Singapore”, Proceedings of World Sustainable Built Environment Conference 2017 (WSBE17), Hong Kong, China, June
  37. Hwang, B.G., Zhu, L., Tan, J.S.H., Chi, S., and Shan, M. (2017). “Project Management Strategies for Green Business Parks: Critical Success Factors, Barriers and Solutions”, Proceedings of World Sustainable Built Environment Conference 2017 (WSBE17), Hong Kong, China, June
  38. Chung, Y., Kim, J., Chi, S., and Hwang, B.G. (2017). “Development of Camera Placement Framework for Site Monitoring”, Proceedings of the 34th International Symposium on Automation and Robotics in Construction (ISARC 2017), Taipei, Taiwan, June
  39. Kim, J., Chi, S., and Hwang, B.G. (2017). “Vision-based Activity Framework Considering Interactive Operation of Construction Equipment”, Proceedings of 2017 International Workshop on Computing in Civil Engineering (IWCCE 2017), Seattle, Washington, USA, June 2017.
  40. Yoo, H.T., Lee, H., Chi, S.*, Hwang, B.G., and Kim, J.W. (2017). “A Preliminary Study on Disaster Waste Detection and Volume Estimation based on 3D Spatial Information” Proceedings of 2017 International Workshop on Computing in Civil Engineering (IWCCE 2017), Seattle, Washington, USA, June
  41. Hwang, B.G., Zhu, L., Ming, J.T.T., Krishnankutty, P., and Shan, M. (2016). “Productivity Improvement Strategies for Green Construction Projects: Performance Comparison and Critical Factors” Proceedings of International Conference on Sustainable Built Environment (SBE) 16, Seoul, South Korea, December
  42. Hwang, B.G., Shan, M., Supa'at, N.N.B., Krishnankutty, P., and Zhu, L. (2016). “Critical Risks in Green Commercial Building Projects: The Case of Singapore” Proceedings of International Conference on Sustainable Built Environment (SBE) 16 Seoul, South Korea, December
  43. , S., Chi, S., and Hwang, B.G. (2016). “A Study on Methodology of Decision-Making Support for International Market Selection Considering Project, Market, and Contractor Factors” 2016 Korea Institute of Construction Engineering and Management Conference (KICEM) Conference, Incheon, Korea, November 2016.
  44. Chung, S., Lim, S., Chi, S., and Hwang, B.G. (2016). “A Preliminary Study on Identifying Risk Factors Causing Damages on Bridges by Analyzing Safety Inspection and Precise Safety Diagnosis Reports Based on Text-mining Techniques” 2016 Korea Institute of Construction Engineering and Management Conference (KICEM) Conference, Incheon, Korea, November 2016.
  45. Hyung Taeck Yoo., Chi, S.*, and Hwang, B.G. (2016). “A Preliminary Study on Disaster Waste Detection and Volume Estimation based on 3D Spatial Information”, 2016 Korea Institute of Construction Engineering and Management Conference (KICEM) Conference, Incheon, Korea, November 2016.
  46. Chung, Y., Kim, J., Chi, S., and Hwang, B.G. (2016). “Camera Placement Design for Vision-based Monitoring”, 2016 Korea Institute of Construction Engineering and Management Conference (KICEM) Conference, Incheon, Korea, November
  47. You, S., Chi, S., and Hwang, B.G. (2016). “An Empirical Research on Occurrences Process and Causes of Unclaimed Invoices in the Korean Construction Industry”, 2016 Korea Institute of Construction Engineering and Management Conference (KICEM) Conference, Incheon, Korea, November 2016.
  48. Kim, J., Chi, S., and Hwang, B.G. (2016). “Preliminary Study - Developing a Vision-basedd Activity Analysis Framework Considering Interactions between Construction Equipment”, 2016 Korea Institute of Construction Engineering and Management Conference (KICEM) Conference, Incheon, Korea, November 2016.
  49. Supriadi, L.S.R., and Hwang, B.G. (2016). “Implementation of Business Continuity Management (BCM) through a Knowledge-Based-Decision Support System (KBDSS)”, Proceedings of Korean Society of Civil Engineers (KSCE) 2016 Convention, JeJu, South Korea, October
  50. Wang, Y.*, Liu, J., and Hwang, B.G. (2016) “Study of Risk Allocation in PPP Projects Based on Altruistic Theory”, Proceeding of the 6th IEEE International Conference on Logistics, Informatics and Service Science (LISS’2016), Bejing, China, July
  51. Hwang, B.G., Enegbuma, W., and Chen, M. (2016). “Enhancing Competitiveness Of Construction Project Risk Management Through Benchmarking Of The IT Industry: Organizational Attitudes, Barriers & Solutions”, Proceedings of CIB World Building Congress 2016, Tampere, Finland, May
  52. Zhao, X., Hwang, B.G., and Low, S.P. (2016). “Hindrances to Enterprise Risk Management in Construction Firms: An Organizational Learning Perspective”, Proceedings of CIB World Building Congress 2016, Tampere, Finland, May
  53. Hwang, B.G., Zhao, X., and Chin, W.Y. (2015). “International Construction Joint Ventures with Developing Countries: Singapore’s Case for Risk Assessment and Allocation”, Proceedings of The 6th International Conference on Construction Engineering and Project Management (ICCEPM), Pu-San, South Korea, October 2015.
  54. Hwang, B.G., Zhao, X., and Leong, L.P. (2015). “Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions”, Proceedings of The 6th International Conference on Construction Engineering and Project Management (ICCEPM), Pu-San, South Korea, October 2015.
  55. Zhao, X.*, Hwang, B.G., and See, Y. L.(2015). “Green Retrofit Projects: Risk Assessment and Mitigation”, Proceedings of The 31st Association of Researchers in Construction Management (ARCOM), Lincoln, UK, September
  56. Zhao, X., Hwang, B.G., and Low, S.P. (2014). “Enterprise Risk Management in Construction Firms: A Framework”, Proceedings of CRIOCM 2014”, 19th International Symposium on the Advancement of Construction Management and Real Estate, Chongqing China, November 2014.
  57. Zhao, X., Hwang, B.G., and Low, S.P. (2014). “Understanding Enterprise Risk Management Maturity in Construction Firms”, Proceedings of CRIOCM 2014: 19th International Symposium on the Advancement of Construction Management and Real Estate, Chongqing China, November 2014.
  58. Hwang, B.G., Zhao, X., and Yu, S.Y. (2014). “Risk Assessment in Underground Rail International Construction Joint Ventures in Singapore”, Proceedings of ASCE International Conference on Sustainable Infrastructure 2014, Long Beach, California, November 2014.
  59. Hwang, B.G., and Ng, W. (2013), “Are Project Managers Ready for Green Construction? - Challenges, Knowledge Areas, and Skills”, Proceedings of CIB World Building Congress 2013, Queensland, Australia, May
  60. Zhao, X., Hwang, B.G., and Low, S.P. (2013), “Exploring Critical Success Factors for Enterprise Risk Management in Chinese Construction Firms”, Proceedings of CIB World Building Congress 2013, Queensland, Australia, May
  61. Supriadi, L.S.R., Low,S.P., Teo, A.L., and Hwang, B.G. (2013), “A Knowledge-Based Decision Support System (KBDSS) for Indonesian Contractors to implement Business Continuity Management (BCM)”, Proceedings of CIB World Building Congress 2013, Queensland, Australia, May
  62. Hwang, B.G., Zhao, X. and Ng. S.Y. (2013), “An Analysis on Factors Affecting Schedule Performance of Public Housing Projects: Case of Singapore”, Proceedings of The 5th International Conference on Construction Engineering and Project Management (ICCEPM), Anaheim, California, January
  63. Zhao, X., Hwang, B.G., and Gay, J.S. (2013), “Identifying Critical Risks in Public-Private Partnership Projects in Singapore”, Proceedings of The 5th International Conference on Construction Engineering and Project Management (ICCEPM), Anaheim, California, January
  64. Chong, C.T., and Hwang, B.G. (2012), “An Empirical Study on the Potential of Pay for Safety Scheme (PFSS)”, Proceedings of CIB W099 International Conference on Modeling and Building Health and Safety”, Singapore, September
  65. Hwang, B.G.* and Tan, J.S. (2012), “Sustainable Project Management for Green Construction: Challenges, Impact, and Solutions”, Proceedings of CIOB World Construction Conference 2012 in conjunction with the Joint Meeting of the CIB W107 “Construction in Developing Country”, Colombo, Sri Lanka, June
  66. Hwang, B.G. and Ho, J. (2012), “Does Front-End Planning Work for the Singapore Construction Industry?”, Proceedings of CIOB World Construction Conference 2012 in conjunction with the Joint Meeting of the CIB W107 “Construction in Developing Country”, Colombo, Sri Lanka, June 2012.
  67. Gao, S*, Low, S.P., Hwang, B.G., and Ofori, G. (2012), “Lean construction in large Chinese construction firms: a SWOT analysis”, Proceedings of CIOB World Construction Conference 2012 in conjunction with the Joint Meeting of the CIB W107 “Construction in Developing Country”, Colombo, Sri Lanka, June
  68. Zhao, X.*, Hwang, B.G., and Low, S.P. (2012). “Implementing Enterprise Risk Management in a Chinese Construction Firm based in Singapore”, Proceedings of CIOB World Construction Conference 2012 in conjunction with the Joint Meeting of the CIB W107 “Construction in Developing Country”, Colombo, Sri Lanka, June
  69. Hwang, B.G., Liao, P.C., and Michael, P. (2011). "Business Strategies: Does Project Ownership Make a Difference?”, Proceedings of International Construction Business and Management Symposium (ICBMS2011) in conjunction with the Joint Meeting of the CIB TG82 “Marketing in Construction” and CIB W112 “Culture in Construction”, KL, Malaysia, September 2011.
  70. Zhao, X., Hwang, B.G., and Low, S.P. (2011). “Enterprise Risk Management of Chinese Construction Firms in Singapore: A research Proposal”, Proceedings of International Construction Business and Management Symposium (ICBMS2011) in conjunction with the Joint Meeting of the CIB TG82 “Marketing in Construction” and CIB W112 “Culture in Construction”, KL, Malaysia, September
  71. Khanna, R.K.*, Hwang, B.G., and Low, S.P. (2011). “Conduciveness of School Environment towards Learning with Total Building Performance through Integrated Design Process”, Proceedings of the 1st International Symposium on Conducive Learning Environment for Smart School (CLES) 2011, Cyberjaya, Malaysia, January 2011.
  72. Hwang, B.G.*, and Tan, H.F. (2010). “Diagnosing the Status of Performance Measurement and Benchmarking in the Singapore Construction Industry”, Proceedings of the RICS Annual Construction, Building and Real Estate Research (COBRA) Conference, Paris, France, September 2010.
  73. Hwang, B.G.* (2010). “Industry-Specific Performance Benchmarking”, Proceedings of CIB World Congress 2010, Salford, UK, May
  74. Hwang, B.G.* (2009). “Identifying Key Sources of Rework Affecting Construction Cost Performance”, Proceedings of the RICS Annual Construction, Building and Real Estate Research (COBRA) Conference, Cape Town, South Africa, September
  75. Huh,Y.*, Hwang, B.G., and Lee, J. (2009), “Development of a Feasibility Analysis Model for Developer-Requested Housing Projects”, Proceedings of ICCEM / ICCPM2009, Jeju, South Korea, May
  76. Hwang, B.G.* (2008). “Development of Industry-Specific Metrics for Benchmarking Pharmaceutical Construction Projects”, Proceedings of CRIOCM2008 International Symposium on "Advancement of Construction Management and Real Estate", Beijing, China, November 2008.

RESEARCH REPORTS

  1. Sensor-Based Mobile App System for Safety Behaviour Self-Diagnosis & Innovations, Ministry of Education, Singapore, 2023.
  2. Technological Competency of Project Managers: Development of a Knowledge-Based Technological Competency Analytics and Innovations System, Humanities & Social Science Research, National University of Singapore, 2021.
  3. Technological Risk Perception and Technological Competency in the Built Environment, Institute for the Public Understanding of Risk (IPUR), National University of Singapore, 2021.
  4. Workface Planning Pilot Projects, Construction Industry Institute, USA, 2018.
  5. Mechanization Study - Construction Industry Institute, USA, 2018.
  6. Best Productivity Practices Implementation Index: Pilot Projects for the Singapore Petrochemical Industry, Construction Industry Institute, USA, 2017.
  7. Introduction of Performance Assessment Metrics and Best Practices, EDRC, Seoul National University, South Korea, 2017.
  8. Implementation of Productivity Improvement Best Practices in Singapore, Korea Institute of Construction Technology, South Korea, 2016.
  9. Activity Analysis Pilot Project Report – Construction Industry Institute, USA, 2016.
  10. Education on Engineering and Construction in the Singapore Construction Industry: Related Government Bodies, Institutions, and Associations, report to HanmiGlobal, Seoul, Korea for the research, “Establishing a Master Plan of the Construction Workforce and Training Advanced Design Personnel for International Projects”, by Korea Agency for Infrastructure Technology Advancement (KAIA), 2014.
  11. Construction Quality Assessment System (CONQUAS) of the Singapore Construction Industry, Global Maestro Report, 2013 3rd Global Report, HanmiGlobal, Seoul, Korea.
  12. Infrastructure Engineering Market & Related Government Bodies, Institutions, and Associations in the Singapore Construction Industry, SungKyunKwan University, Seoul, Korea, 2013.
  13. Benchmarking Assessment and Evaluation Methods for Public Construction Projects, Korea Institute of Construction Technology, South Korea, 2013.
  14. Benchmarking Global Benchmarking Initiatives for the Singapore Construction Industry, Department of Building, National University of Singapore, Singapore, 2011.
  15. Pharmaceutical/biotechnology Facility Benchmarking Summary Report (Second), Construction Industry Institute, The University of Texas at Austin, Austin, TX, USA, 2010.
  16. Pharmaceutical Benchmarking Summary Report. BMM2005-10 (October), Construction Industry Institute, The University of Texas at Austin, Austin, TX, USA, 2005.
  17. Benchmarking and Metrics 2004 Safety Report. BMM2004-2 (October), Construction Industry Institute, The University of Texas at Austin, Austin, TX, USA, 2004.
  18. Benchmarking and Metrics 2003 Safety Report. BMM2003-2 (October), Construction Industry Institute, The University of Texas at Austin, Austin, TX, USA, 2003.

MEDIA/ PERIODICAL ARTICLES

  1. “Digital Transformation of the Singapore Construction Industry”, Forum held by Smart Modular forum Korea, Korea Land & Housing Corporation, and E Daehan Economy, Korea, September 2022. Read more
  2. “The Time of Architecture – Evolving Architecture (Episode 6)”, Special documentary, MBC Broadcasting, South Korea, Jan 2021. Read more
  3. “The Time of Architecture – Boredom & Sensation (Episode 7)”, Special documentary, MBC Broadcasting, South Korea, Jan 2021. Read more
  4. “Productivity Revolution - Lessons learnt from Singapore (Episode 3): Modularisation”, Construction Economics Newspaper, South Korea, 13 Feb 2019. Read more
  5. “Productivity Revolution: Lessons learnt from Singapore (Episode 2): Singapore, Country for Productivity Innovation”, Construction Economics Newspaper, South Korea, 11 Feb 2019. Read more
  6. “Productivity Revolution: Lessons learnt from Singapore (Episode 1): Why Construction Productivity Innovation?”, Construction and Economics Newspaper, 11 Feb 2019. Read more
  7. “Project Risk Management”, The New Paper, Wednesday, 20 December 2017, p28 (2nd post).
  8. “Project Risk Management”, The New Paper, Wednesday, 22 November 2017, p28 (1st post).
  9. "Right on Schedule”, The New Paper, Wednesday, 25 October 2017, p39.
  10. “Project Risk Management: Maximising opportunities while minimizing risks to deliver successful project”, The Straits Times, Thursday, 27 July 2017, C24.
  11. “Right on Schedule: Time is a precious resource and needs to be managed for project success”, The Straits Times, Thursday, 13 July 2017, C24 (3rd post).
  12. “Right on Schedule: Time is a precious resource and needs to be managed for project success”, The Straits Times, Friday, 16 June 2017, C24 (2nd post).
  13. “Right on Schedule: Time is a precious resource and needs to be managed for project success”, The Straits Times, Tuesday, 13 June 2017, C22 (1st post).
  14. “The Green Revolution of Singapore for Sustainable Construction and Environment: the 2nd Green Building Master Plan”, Construction and Engineering Information, Korean Journal of Construction Engineering and Management, 10 (3), 51 – 54, 2009.
  15. “Development of the 2nd Generation Performance Metrics and System for Construction Project Performance Assessment”, Construction and Engineering Information, Korean Journal of Construction Engineering and Management, 9 (1), 19 – 22, 2008.
  16. “Correlation and Regression 2nd Edition” Book Review, Korean Journal of Construction Engineering and Management, 8 (5), 58 – 59, 2007.